Saturday, July 31, 2010 , 4:42 PM
About Work
Day 2 (30/31 Jul 10 - Night Shift)
Completed the following tasks for Parts Prep
- Autoclave
- Stoppers Load (0RMA653) - Completed & Unload
- Ad-Hoc Load - Completed & Unload
- LKT & BDT - Done
- Lyo Cleaning Load (0RMA652) - Inprogress
- DHO
- Lyo Tray Frames (0RMA653) Completed & Unload
- Parts Washer
- Load 9 (0RMA652) - Completed & Wrapped
- Trays Washer
- Load 3 & 4 (0RMA653) - Completed & Unload
- LKT - Done
- Load 5 (0RMA653) - Completed & Unload
- Vials Washer
- Trial Run - Completed
- LNC & CNS1 - Done
- General
Friday, July 30, 2010 , 5:09 PM
About Work
Day 1 (29/30 Jul 10 - Night Shift)
Completed the following tasks for Parts Prep
- Autoclave
- 2nd Compounding Load (0RMA653) - Completed & Unload
- 2nd Lyo Cleaning Load (0RMA651) - Completed & Unload
- LKT & BDT - Done
- Filling Stoppering Load (0RMA653) - Inprogress (Start @ 04:42)
- Filling Gloves Load (0RMA653) - Prepared (Check before load in)
- DHO
- 2nd Stopper Hopper (0RMA653) - Completed & Unload
- Tray Washer
- 2nd Load 8 & 9 (0RMA651) - Completed & Unload
- LKT - Done
- 2nd Load 10 (0RMA651) - Completed but not yet approved. (Alarm: "Maximum Jacket Pressure Exceeded") Pending Anuj decision.
- General
- PP CNS - Done
- Carousel 3 & 6 sent back to production. Require Spor-Klenz & IPA.
- Request component for 0RMA652 (Secondary) & 0RMA654 (Primary)
- I&P
- 3/3 inspection completed
- 2/3 (1 trolley) inspection completed
Friday, July 23, 2010 , 11:23 PM
About Work
Day 3 (23 Jul 10 - Day Shift)
Completed the following tasks for Parts Prep
- Parts Washer
- Load 7 & 8 (0RMA651) - Completed & Wrapped
- Autoclave
- Compounding Load (0RMA651) - Completed & Unload
- Filling Stoppering Load (0RMA651) - Completed & Unload
- Stoppers Load (0RMA651) - Inprogress
- Filling Gloves Load (0RMA651) - Prepared. (Please check before load in)
- DHO
- 1st Stopper Hopper & Vibrating Chute (0RMA651) - Unload
- 2nd Stopper Hopper (0RMA651) - Completed & Unload
- Tray Washer
- Load 2, 3 & 4 (0RMA651) - Completed & Unload
- Load 5 (0RMA651) - Inprogress
- Vial Washer
- Exhaust modification done by E&M - Completed
- CNS1 - Done
- General
- Carousel 3 & 6 had sent to E&M for maintenance.
- Surge Tank had send to E&M to remove screw that was struck.
- Please use the template attached to the pass down book for Tray Washer Carousel status.
- Please help to stock up the consumable & MI at lift lobby.
Thursday, July 22, 2010 , 11:15 PM
About Work
Day 2 (22 Jul 10 - Day Shift)
Completed the following tasks for Parts Prep'
- Autoclave
- Lyo Cleaning Load (0RMA649) - Completed & Unload
- Ad-Hoc Load - Completed & Unload
- Parts Washer
- Load 3, 4 & 5 (0RMA651) - Completed & Wrapped
- Load 6 (0RMA651) - Inprogress
- DHO
- 1st Stopper Hopper & Vibrating Chute (0RMA651) - Inprogress
- Tray Washer
- Load 5 (0RMA651) - Completed & Unload
- Trial Run without trays (Carousel 5) - Pass
- Trial Run with trays (Carousel 7) - Failed (Alarm: "Drum Drive Monitoring")
- Trial Run with trays (Carosuel 3) - Inprogress, Failed (Alarm: "Drum Drive Monitoring")
- Vial Washer
- Batch 0RMA650 - Inprogress
- General
- Please run Tray Washer Trial Run with Trays (Carousel 5) follow by Load 1 for 0RMA651.
Wednesday, July 21, 2010 , 10:16 PM
About Work
Day 1 (21 Jul 10 - Day Shift)
Completed the following tasks for Parts Prep
- Autoclave
- Stoppers Load (0RMA650) - Completed & Unload
- Filling Stoppering Load (0RMA650) - Completed & Unload
- Filling Gloves Load (0RMA650) - Inprogress
- DHO
- 2nd Stopper Hopper (0RMA650) - Unload
- Lyo Tray Frames (0RMA650) - Inprogress
- Tray Washer
- Load 1 & 2 (0RMA650) - Completed & Unload
- Load 3 (0RMA650) - Alarm "Drum Drive Monitoring" for Carousel 6
- General
- Please run Cleaning Load & Lyo Cleaning Load (0RMA649).
- Please run Load 11 (Replace Load 3) for Tray Washer. Do not bring out carousel 6.
- Please print an extra copy of Tray Washer Load 3 for (E&M) LaiKK.
- Current carousel that can be use: 2 & 4
- Please run a trial run for carousel 5 & 7 due to Micro have done dabbing.
- 2 carousel prepared with new trays. (Carousel 2 & 4)
Monday, July 19, 2010 , 6:37 PM
Time to post something instead of work-related stuff..
1st.
Congrat Edmund Kor & Eve Da-sao for having a cute and chubby baby girl (Giselle)..
I start to miss my baby niece (Estella).. which rest in peace on 16May10..
I wish that i can have a baby girl as my daughter but i think i dont have a chance to have it.. having 2 boys is already a big headaches..
2nd
Congrat Mylene & Sam in advance.. wish you "招生贵子"
3rd
My blogshop is now open. feel free to visit @
http://meteor-fashions.blogspot.com/
Saturday, July 17, 2010 , 10:26 PM
About Work
Day 3 (17 Jul 10 - Day Shift)
Completed the following tasks for Parts Prep
- Autoclave
- BDT - Inprogress (Start @ 19:27)
- Can start Batch 0RMA649 loads after BDT completed & pass
- Parts Washer
- Load 7 & 8 (0RMA649) - Completed & Wrapped
- DHO
- Stopper Hopper & Vibrating Chute (0RMA649) - Inprogress (Start @ 18:30)
- Tray Washer
- Please run a trial run before starting any batch loads. This is to ensure that the stream is back to normal. Doesnt need to run LKT.
- 2 carousel prepared. (Carousel 4 & 5 for 0RMA648 Load 9 & 10)
- Vial Washer
- Please continue to monitor the temperature of the tunnel. Every 1 hrs until 00:00hrs. Record down the temperature data and pass it to Valan so he can send an email to LaiKK.
- Please do CNS2 after montoring of temperature is completed due to change of HEPA filters.
- Ask KokSia to completed the batchsheet for 0RMA648 Section D.
- General
- CNS1 for Parts Prep - Done [After batch completed]
- Filling Stoppering Load (0RMA649) - Prepared. Please check before loading to Autoclave.
- Filling Gloves Load (0RMA649) - Partially Prepare. [Only left gloves for Wrapping]
- Please passdown to (Team A) Umah, ask her to get a new timer for Parts Prep from Sharlene (Redipen) due to the current timer drop into water.
- Do not use the small diapharagm valve at Supervisor Office (2178). Found leakage while it is in close position.