About Work
Day 3 (08 Jan - Day Shift)
A relax - busy day..
Quite relax during the 1st few hours as we are waiting for E&M personal to troubleshoot on Vial Washer/Tunnel bcos of the OIP panel was blackout & Inlet shuttle door was not closed..
While waiting, XiaoFei & Tee from E&M - Instrumental come and check on Tray Washer bcos of yesterday Leak Test. I was assign to stay with them, Elizabeth stay with another group of E&M at Vial Washer/Tunnel while Faiz was at E&M Workshop doing engraving.
Completed the following tasks for Parts Prep
- Autoclave
- Ad-Hoc Load - Completed & Unload
- Filter Ster (Prog 6) - Abort due to Temperature Deviation
- Filter Ster (Prog 6) - Inprogress (Start @ 18:17)
- Tray Washer
- Load 2 (TS-176) - Completed & Unload
- Leak Test (E&M Monitoring) - Completed & Pass (4 cycle, 9 to 11 mbar)
- Leak Test (after E&M Monitoring) - Completed
- Trial Run (Empty Carosel) - Inprogress (Start @ 17:24)