Happy Birthday Boon Pin
About Work
Day 1 (24/25 Sep 09 - Night shift)
All loads have already prepared for Team D to complete the cycle.. except for manual cleaning of Lyo Tray Frames & Lyo Tray Frames cycle for DHO..
Morning went we take the transport from Biotech - Tablet.. (in the company) the bus driver show us the KoDoMo Dragon.. infront of our bus.. there's a truck.. the truck driver come out and wanted to catch it.. I think the KoDoMo Dragon was too scare.. he's tried to run away by sqeezing (dunno how to spell) thru the fence.. the KoDoMo Dragon size is about 30cm long and 10cm wide..
Day 2 (25/26 Sep 09 - Night Shift)
Today nothing much to do.. Only left Lyo Cleaning Load (9RMA621) & Tray Washer Load 8 to 10 (9RMA621)..
Almost half of the shift we (Me, Beth, Cindy & Darwin) is busy @ I&P.. helping the complete Repack 280 (9RMA620), complete the batchsheet & do CLN for the I&P machines.. ^^ quite happy with my learning of counting the Room Temperature Hold Time.. but i abit too KPO bah.. go and recount LayKuan calculation for 9RMA611.. and found out a calculation mistake.. Sorry LayKuan..
Day 3 (26/27 Sep 09 - Night Shift)
I'm on AL today.. Albert Tan is my replacement
I will be replacing him for the next 3 night..